Engineering & Design

Commissioning & Operational Readiness
Project management, operational readiness and technical due diligence for CS Energy's renewable hydrogen demonstration plant.
CS Energy's Kogan Renewable Hydrogen Demonstration Plant pairs solar generation with electrolysis, storage and tube trailer offtake. As a demonstration asset for a government-owned generator, it had to be built, commissioned and handed over to operations safely and in full compliance.
As Owner's Engineer and Project Manager, Amarna has supported CS Energy through construction and into operations. We delivered operational and safety studies, compliance reviews, EPC management and project handover, across a scope covering the solar array, battery storage, electrolysis, compression, storage and tube trailer loading.
The plant is part of a wider CS Energy portfolio that includes the proposed 400 MW Brigalow Peaking Power Plant, designed to run on a blend of green hydrogen and natural gas.
Tell us what you're working on, and one of the people below will get back to you.
Talk directly to


Want to join us? We're always keen to hear from engineers who value strong fundamentals and real delivery experience.
Careers at Amarna